Precautions for the installation of laboratory jaw crusher

   The machine must be installed in a place sheltered from rain, and should not be installed in the open air as much as possible.

 lab jaw crusher (61).jpg

       The motor must be installed at the rear of the jaw crusher machine. The machine has four anchor screws fixed on the concrete foundation. The foundation should leave a discharge port with a slope of not less than 50 degrees.

 

       The small rock crusher used in the experiment does not need to lay the foundation, nor does it need to consider the discharge. However, it should be placed on a flat ground or a workbench, and a rubber plate of about 5mm should be placed to achieve stability and shock absorption.

 

        The jaw crusher is used in conjunction with other equipment, and it must be arranged to facilitate production and facilitate operations.

 

After the crusher is installed and the solidification period of the foundation has passed, the test run can be carried out. Before the test run, check again whether all the screws are tightened and whether the connecting parts are in reliable contact. Then turn the pulley by manpower first, and when it is confirmed that the movement is not hindered, the empty test can be carried out. After the empty test for two hours, observe that the machine has no impact, no noise, no oil leakage at the seal, and no swing of the pulley and flywheel. There is no looseness of the machine parts, and the temperature rise of the bearing does not exceed 65°C. If any of the above faults are found, stop the machine immediately for maintenance. After confirming that the test operation of the crusher is normal, the load test can be carried out. Use materials with low hardness or small pieces to work. If there is no failure, normal production can be carried out.